Description
- 5 Pin M12 quick disconnect
- Option of connecting lights together
- Backlight version of L300
- PNP and NPN strobe input
- Continuous operation or strobe mode
- Dimmable via built in potentiometer
- Analog intensity 0-10VDC signal
- Twelve, 1mm² die high current LEDs
Smart Vision Lights LB300 Technical Specifications
LB300 Specifications
Electrical Input | 24 VDC +/- 5% |
Input Current | Max. 700 mA |
Input Power | Max. 17 W |
PNP Trigger | 2.8 mA @ 4VDC | 8.8 mA @ 12VDC | 17.6 mA @ 24VDC |
NPN Trigger | 14.4 mA @ Common (0VDC) |
Trigger Input | PNP > +4 VDC (24 VDC max.) to activate or NPN ≥ GND <1VDC to activate (not both) |
Strobe Duration | Min. 1 μs | Max. ∞ |
Power Indicator | Turns green when powered up |
Status Indicators | Strobe indicator will turn yellow when on |
Analog Intensity | The output is adjustable from 10% - 100% by a 1 - 10 VDC signal or front potentiometer. Jumpering pin 5 to pin 1 will provide maximum intensity |
Connection | 5-pin M12 connector |
Operating Temperature | -10° to 40° C (14° to 104° F) | RH max 80% non-condensing humidity |
Storage Temperature | -20° to 70° C (-4° to 158° F) | RH max 80% non-condensing humidity |
IP Rating | IP50 |
Weight | ~370 g |
Compliances | CE, IEC 62471, RoHS |
Warranty | 10 years* |
LB300 Downloads
![]() |
![]() |
![]() |
![]() |
Possible Part Combinations:
LB300-365LB300-395
LB300-470
LB300-505
LB300-530
LB300-625
LB300-850
LB300-940
LB300-WHI
LB300-365-W
LB300-395-W
LB300-470-W
LB300-505-W
LB300-530-W
LB300-625-W
LB300-850-W
LB300-940-W
LB300-WHI-W
LB300-470-L
LB300-505-L
LB300-530-L
LB300-625-L
LB300-850-L
LB300-940-L
LB300-WHI-L
LB300-470-LPI
LB300-505-LPI
LB300-530-LPI
LB300-625-LPI
LB300-WHI-LPI
LB300-470-W-LPI
LB300-505-W-LPI
LB300-530-W-LPI
LB300-625-W-LPI
LB300-WHI-W-LPI
LB300-470-L-LPI
LB300-505-L-LPI
LB300-530-L-LPI
LB300-625-L-LPI
LB300-WHI-L-LPI
Estimate shipping
Payment & Security
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.
Lead Times
Lead Times are estimated based on standard product lead times, but are subject to change. For the latest product lead times, we always recommend contacting us